LeDuc & Dexter Inc. 2833A Dowd Drive P.O. Box 11157 Santa Rosa, CA 95406
TEL (707) 575-1500 FAX (707) 575-1276 CL 548129 |
|

|
|
TOM TOEDTER Construction Mgr. Sonoma-Cutrer Vineyards
Windsor, CA |
|
"We've done two substantial projects with
LeDuc & Dexter, over half a million dollars' of work. One system has 30 miles of pipe and 14 pumps. We have a great rapport with their field people as well
as their administrative people. They are really excellent. Proficiency is our number one consideration, and they are very proficient every step of the way. We produce a first-class
wine, and we do it working with first-class people like LeDuc & Dexter." |
Sonoma-Cutrer Vineyards with Croquet Area in Forefront Design/Build Temperature Control System Temperature Controlled Barrel Room (Click on thumbnails for a larger view.)
|
Back to Clients
|
|
CHRISTINA BENZ Winemaker Murphy-Goode Winery |
|
"We've been working with LeDuc & Dexter
for a number of years. They designed and installed the plumbing and fire protection in our barrel storage building that was completed in 1996. Currently LeDuc & Dexter is
installing plumbing and compressed air lines for our crush pad expansion. Their project manager Bill Zeeb has provided timely supervision, and he coordinated well with other subs. His suggestions
like where to install a hose station, for instance, seem like a small thing, but it can be invaluable when we are in operation – it's an example of LeDuc & Dexter professionalism." |
Murphy-Goode Winery Gas & Water Lines in the Tank Room (Click on thumbnails
for a larger view.) |
Back to Clients
|
|
STEVE RONCHELLI Project Manager Jim Murphy & Associates,
General Contracting & Consulting |
|
"In selecting LeDuc & Dexter as the plumbing contractor for the Clos Du Bois winery expansion, we knew we were
getting a top-flight professional company. They take considerable pride in the quality of their work. LeDuc & Dexter did not let us down. They were extemely cooperative. All of
their work was completed correctly the first time, period, with the utmost eye for detail." |
Clos Du Bois Winery Hot Water, Air, Nitrogen & CO2 Lines (Click on thumbnails
for a larger view.) |
Back to Clients
|
|
BILL MOON Maintenance Supervisor Ferrari-Carano Winery |
|
"We continue to use LeDuc & Dexter because their work is always completed to our satisfaction, their response time is
excellent and they always honor their work warranty. Bill Zeeb was able to design LeDuc & Dexter's system to match our system at the winery, overall they're one of the best
subcontractors we've worked with." |
Hospitality Center & Tasting Room Overhead Stainless Wine Transfer Lines (Click on thumbnails
for a larger view.) |
Back to Clients
Sonoma Mountain Estate Brewery |
|
CHRIS ATKINSON Master Brewer Sonoma Mountain Estate Brewery |
|
"With the help of LeDuc & Dexter we reassembled a 32-year-old, solid copper, two-vessel brewing system from Germany to
its original state. LeDuc & Dexter designed and built the custom steam system, upgrading it to present-day pressure standards. They also put in all our CO2 and domestic water lines.
LeDuc & Dexter was very responsive and creative on this complicated project. The company was great to work with and LeDuc & Dexter's business integrity is second to none." |
Brewing Tank with Logo Copper Brewing Kettles German Brew House Circa 1965 (Click on thumbnails for a larger view.)
|
Back to Clients
|
|
|